Plumbing
Pipe replacement at an air force base
Suffolk
Project Details
- Duration
- 1 week
- Project Value
- Between £12 000 and £16 000
- Engineers
- 4
- Scope of Work
- Pipe replacement at an air force base
About This Project
Working on an active air force base brings a level of scrutiny well beyond a typical commercial site. Access, scheduling and conduct were subject to strict protocols, and every stage had to be planned and signed off in advance. The work involved removing all existing iron pipework and replacing it with PVC in sizes ranging from ¾ to 8 inch. Despite the logistical demands, the job was completed on schedule and signed off by the base facilities team without issue.