Project Details

Duration
5 months
Project Value
Between £50 000 and £75 000
Engineers
5
Scope of Work
Removal of all existing iron hot water pipe work and replacement with copper pipe work. Removal and descaling of calorifiers as well

About This Project

With access restricted to weekends only, this five-month project demanded meticulous planning to keep progress on track. The scope spanned multiple disciplines and covered a seven-floor building with over 140 rooms. All existing iron pipework was cut out section by section before the new copper pipework was installed, lagged and labelled with flow direction throughout. Two calorifiers were removed for refurbishment and descaling, then reconnected into the system with new pipework. At that scale, there was no room for error - and the finished installation reflected that.

Project Photos

Project photo 1
Project photo 3
Project photo 5
Project photo 7
Project photo 9
Project photo 11
Project photo 2
Project photo 4
Project photo 6
Project photo 8
Project photo 10
Project photo 12