Chiller & Plumbing

Chiller and pump replacement

Milton Keynes

Project Details

Duration
1 week
Project Value
Between £55 000 and £70 000
Engineers
4
Scope of Work
Chiller and pump replacement

About This Project

At a 24/7 factory where cooling is essential to keep the production machinery running, there was no acceptable window for downtime. The job did not go without complications: the crane failed to start and required hours of remote technical assistance before it was operational, and the manufacturer delivered the wrong pumps entirely. Rather than leave the client without cooling, we kept the old pumps running while correct replacements were sourced and fitted. It made for a very long night, but the factory never stopped - which was the only outcome that mattered.