Air Conditioning
Disposal and replacement of air conditioning systems in gym
Berkhamsted
Project Details
- Duration
- 5 days
- Project Value
- Between £12 000 and £20 000
- Engineers
- 2
- Scope of Work
- Removal and replacement of air conditioning systems supplying a gym
About This Project
The gym had ageing air conditioning systems that were no longer performing efficiently and were becoming increasingly costly to maintain. Our team surveyed the existing setup before planning the removal and replacement of all units. Special care was taken to minimise disruption to opening hours, with the bulk of the work scheduled outside busy periods. All refrigerant was safely recovered and disposed of in line with FGAS regulations. The new systems were installed, commissioned and handed over on schedule - quieter, more energy-efficient, and built to handle the heat loads of a busy gym.