| With over 80 cables in total
feeding the boilers, all of which were
buried under the concrete floor - this job was one that required a lot of planning and coordination long before it even started. This job took our skilled engineers only a couple of days which included the tracing of each individual cable in order to find out where both ends were connected (this was necessary since all the previous cables were the same colour and unlabeled), removing all the old wiring, cleaning up and briefing the client every step of the way.
|
|
| Location of project: |
Tunbridge Wells
|
| Duration of project: |
2 days |
| Value of project: |
Between £5 000 and £7 500 |
| Number of Engineers: |
2 |
| Scope: |
Rewiring of 4 boilers and all associated electrical components |
| |
|